We were pleased to be working alongside Wavin UK Ltd. We delivered a three bay extension to the existing factory approximately 6150sqm floor area to increase production capacity.
Works included:
The key advantages for Wavin were:
Being a design and build project, working closely with the design team was critical.
Our in-house managers were working hard alongside the designer to ensure this project had the very best end results on time and budget.