We were pleased to be working alongside Wavin UK Ltd. We delivered a three bay extension to the existing factory approximately 6150sqm floor area to increase production capacity.

About the project.

Works included:

  • Demolition and relocation of existing structures
  • Associated drainage and external works
  • Construction of a portal steel frame
  • Extension to an additional warehouse

The key advantages for Wavin were:

  • Maintaining Wavin’s core operations.
  • Coordination and management of Wavin’s direct subcontractors
  • M&E Coordination

Being a design and build project, working closely with the design team was critical.

Our in-house managers were working hard alongside the designer to ensure this project had the very best end results on time and budget.