We were delighted to have worked with ABP to refurbish the Mayflower Cruise Terminal in Southampton.

 

About the project.

The work involved:

  • Refurbishment of external drop off point and car parking
  • Replacement of the northern external façade
  • Remodelling of internal layouts
  • Addition of an internal lift and two storey extension

As well as the above, existing mechanical and electrical systems were renewed as part of the alternations, including new toilet facilities, provision of a new VRF heating / cooling
system and replacement of the existing foul drainage system. The new system was a bio-digester with a pumped system; the latter involving trenching within the Port to connect with an existing sewer pipe run.