We were delighted to have worked with ABP to refurbish the Mayflower Cruise Terminal in Southampton.
The work involved:
As well as the above, existing mechanical and electrical systems were renewed as part of the alternations, including new toilet facilities, provision of a new VRF heating / cooling
system and replacement of the existing foul drainage system. The new system was a bio-digester with a pumped system; the latter involving trenching within the Port to connect with an existing sewer pipe run.